Displayr
Create
Log in
Sign up
Roadmap
Feedback
Displayr
1439
Boards
Q Research Software
Displayr
Powered by Canny
Displayr
Anonymous
Description
Category
AI
Usability/UX
Page Master
Controls
Search
Custom Calculations
Calculation Grids
Errors and Warninngs
Variables
Date/Time variables
Ready-made new variables
Visualizations
Data Labels
Axes
Legend
Series
Trendlines
Small multiple visualizations
Hover
Captions
Automation
Rules
QScripts
Tables
Sorting
Banners
Exporting
View Mode
PowerPoint
Excel
PDF/Image
Data Files
Explore Mode
Filtering
Weighting
Account Administration
Advanced Analysis
Segmentation
Regression
MaxDiff
Conjoint
TURF
Text Analysis
Data Import
API/Data Integration
Merging
Significance Testing
Displayr Cloud Drive
Other
Collaboration
Documents Page
Native R Interpreter
Uncategorized
Showing
Trending
Sort
Trending
Top
New
Filter
Under Review
Backlog
Planned
In Progress
Complete
posts in
All Categories
All Categories
AI (8)
Usability/UX (118)
Page Master (18)
Controls (41)
Search (10)
Custom Calculations (51)
Calculation Grids (10)
Errors and Warninngs (11)
Variables (114)
Date/Time variables (9)
Ready-made new variables (9)
Visualizations (355)
Data Labels (20)
Axes (50)
Legend (14)
Series (31)
Trendlines (2)
Small multiple visualizations (8)
Hover (9)
Captions (14)
Automation (98)
Rules (58)
QScripts (34)
Tables (151)
Sorting (15)
Banners (9)
Exporting (162)
View Mode (36)
PowerPoint (32)
Excel (33)
PDF/Image (5)
Data Files (9)
Explore Mode (21)
Filtering (47)
Weighting (17)
Account Administration (61)
Advanced Analysis (64)
Segmentation (5)
Regression (7)
MaxDiff (10)
Conjoint (15)
TURF (8)
Text Analysis (33)
Data Import (62)
API/Data Integration (25)
Merging (9)
Significance Testing (52)
Displayr Cloud Drive (16)
Other (72)
Collaboration (4)
Documents Page (3)
Native R Interpreter (6)
Set angle for pie chart
Request to set the initial angle in an R-based visualization > Pie chart.
2
·
in progress
11
Ability to create Folders/ Organize Templates
Allow users to organize their saved templates. For example, by Type (Page, Calculation, Viz...) or by creating Folders (for different teams, clients). etc.
1
·
in progress
5
Group items on a page
In the Arrange menu, it will be useful to have the functionality to group items, so you select the objects that you want to be in the same group, for instance, a chart, with some text, or if someone wants to overlay a couple of charts.
4
·
in progress
12
Pie chart: Move the position of data labels
The user would like to move the data labels in a Pie chart to appear within the Pir - rather than on the side.
3
·
in progress
12
Ability to hide objects from published documents and exports independently
There are objects like combo boxes, visualizations, or text boxes that make sense to show in a published document but either due to the content or the way they are exported need to be excluded from exports to Office or PDF. Today hiding from one automatically hides from the other.
4
·
in progress
24
Show both variable label and name in Data Sets Tree
Show both variable label and name in Data Sets Tree at all times, not just when performing a calculation.
2
·
in progress
7
Sort variables within Variable Set
You can’t sort variables based on label in a variable set - like you can in Q. This would help a TON when working with grid style questions where lots of label manipulation on like labels is needed and ordering. Sorting the variables based on labels would help with selecting those that needed editing or splitting off and other things. Workaround is to sort by hand or to just manually click each individual variable or break the set.
3
·
in progress
8
Allow change variable structure in bulk
The user wishes to change a number of variables from ordinal to numeric. They can do this individually but it’s not as simple to do this in bulk unless the variables are combined as a variable set.
3
·
in progress
4
Add folders to Displayr Cloud Drive
Add folders to Displayr Cloud Drive
5
·
in progress
20
Pie chart: Remove data labels
The user would like to be able to move or completely remove the data labels from a Visualization > Pie Chart. It’s possible to change the font color and the size of the labels. But when doing so the lines leading to the labels remains visible:
2
·
in progress
6
Load More
→
Powered by Canny